Save Up to 40% Off Your Project. Ask Us How.
(800) 333-6695 | Licensed & Insured · CSLB #964965 | Serving California since 2011
Green Conception, California solar and roofing
Solar Policy · Updated June 2026

NEM 3.0, Explained for California Homeowners

In Short

NEM 3.0, officially the Net Billing Tariff, is California's current rooftop solar policy for PG&E, SCE and SDG&E customers. It pays far less for power exported to the grid than older rules, which makes pairing solar with a battery the key to strong savings.

California changed how rooftop solar gets paid in April 2023, and the rules are now settled. The policy is officially the Net Billing Tariff, but almost everyone calls it NEM 3.0. If you are planning solar for your California home, this is the single most important policy to understand, because it shapes how your system should be designed.

This guide explains what changed, who NEM 3.0 applies to, and how to design a system that still pays for itself under the current rules.

What NEM 3.0 Changed

Under the older NEM 2.0 rules, when your panels sent extra power to the grid, your utility credited you at roughly the full retail rate, often around 30 to 40 cents per kilowatt-hour. That made solar-only systems pay back quickly.

NEM 3.0 ties export credits to avoided-cost values that change by hour and season. In practice, midday exports now earn roughly 5 to 8 cents per kilowatt-hour, a drop of about 75 percent. Power you use directly in your home still offsets the full retail rate, so the strategy shifts from exporting to self-consumption.

Who NEM 3.0 Applies To

NEM 3.0 applies to new solar customers of the three large investor-owned utilities: PG&E, SCE and SDG&E. If you are served by one of these, your new system falls under the Net Billing Tariff.

Customers of municipal utilities such as LADWP and SMUD are not on NEM 3.0. Those utilities run their own net metering programs, often with more favorable terms, so the right design depends on who delivers your power.

Why Battery Storage Became the Baseline

Because midday exports earn little and evening grid power costs the most, a battery is now the piece that makes the economics work. Your panels charge the battery during the day, and the battery powers your home through the expensive evening peak instead of buying that power back at premium rates.

Battery attachment rates in California climbed from around 11 percent before NEM 3.0 to more than half of new installations afterward. A well-sized solar-plus-battery system typically brings payback back into the range of solar under the old rules.

How to Design Around NEM 3.0

Three moves protect your return under the current rules. Size the system to your real usage rather than oversizing for export. Add storage so you self-consume more of what you produce. Shift heavy loads, like EV charging and pool pumps, into hours when your own solar or stored energy covers them.

  • Size to roughly cover your annual usage, not to maximize exports.
  • Pair solar with a right-sized battery to capture the evening peak.
  • Move large loads into daylight or stored-energy hours.
  • Confirm your utility, since LADWP and SMUD rules differ from the big three.
NEM 2.0 vs NEM 3.0 (Net Billing Tariff)
FeatureNEM 2.0NEM 3.0
Export credit valueNear full retail rateLower, based on avoided-cost values
Best system designSolar can stand aloneSolar paired with a battery
Who it applies toGrandfathered legacy customersNew PG&E, SCE and SDG&E solar
Payback driverExporting excess to the gridUsing and storing your own power
Common Questions

Questions, Answered

Is NEM 3.0 still in effect in 2026?
Yes. The Net Billing Tariff remains the active policy for new solar interconnections on PG&E, SCE and SDG&E. Legal challenges have been resolved in favor of the current rules, so it is the framework you design around today.
Does NEM 3.0 apply to LADWP customers?
No. NEM 3.0 applies only to the three investor-owned utilities. LADWP, SMUD and other municipal utilities run separate net metering programs with their own terms.
If I am on NEM 2.0, do I keep my old rates?
Generally yes. Systems interconnected before April 15, 2023 are typically grandfathered on NEM 2.0 for 20 years from their permission-to-operate date. Adding a right-sized battery usually does not change that status.
Related Services

Put This Into Action

Keep Reading

More Guides

Lock In Up to 40% Off Your Project.

Start your complete solar and roofing project with one licensed California team handling everything from your roof to your switch. Get a full quote without an on-site visit.