rdt('init', 'a2_er8w1hjthqbd', { email: '', externalId: '', idfa: '', aaid: '', });
top of page

✓ California Licensed Contractor

✓ CSLB #964965

✓ Family-Owned & Operated

✓ Fully Insured

✓ Serving California Homeowners Since 2014

Solar photos.avif

- ONE STOP SOLAR AND ROOFING IN LOS ANGELES COUNTY

One Stop Solar and Roofing in Pacific Palisades, CA

Serving Pacific Palisades homeowners in ZIP 90272 with licensed solar installations and roofing replacements built for coastal conditions and LADWP net metering.

Since 2014

Serving California homeowners

60+

Verified customer reviews

$0

Down · 100% financing available

Lic. 964965

CSLB licensed & insured
Green Conception Roof replacement

Built for this community

Why Permit Complexity in Pacific Palisades Demands One Crew

Pacific Palisades isn't a simple permit pull. Los Angeles County coastal zone regulations layer on top of standard city building requirements, and solar installs near bluff-adjacent lots can trigger additional review from the California Coastal Commission. Pulling separate permits for roofing and solar through different contractors doubles the paperwork, doubles the inspection scheduling, and creates liability gaps between trades. Green Conception files one permit package covering both scopes. That means one inspection timeline, one point of contact, and one warranty that doesn't leave you arguing over which contractor owns a leak. 90272 permit timelines average 5-8 business days when the package is clean. Ours are clean.

The benefits

Six Reasons Pacific Palisades Homeowners Choose One Stop Solar and Roofing

Single Permit Package Saves Time

One application covers roofing and solar together. Los Angeles County coastal zone reviews move faster when the package is complete upfront - no back-and-forth between two separate contractor submittals.

Salt Air Rated Materials Only

90272 roofs face constant salt air off the Pacific. Every shingle, underlayment, and racking component we spec is rated for coastal exposure - not just standard California residential grade.

LADWP Net Metering Ready

Solar systems in Pacific Palisades interconnect with LADWP, not SCE. We file the interconnection application and size the system to your actual LADWP bill, not a generic estimate.

No Warranty Gap Between Trades

Separate roofing and solar contractors leave a gap - each points at the other when a leak shows up. One crew, one warranty, zero finger-pointing. That protects you.

Coastal Commission Familiarity

Bluff-adjacent and ridge lots in 90272 sometimes require Coastal Commission sign-off. We've navigated that process before and know exactly what the application needs.

No Deposit Required to Start

Written quote, no-obligation estimate, no deposit to get started. Review the full scope and pricing before committing to anything. Simple as that.

01

Free Roof and Solar Inspection

We inspect the roof deck, check for coastal moisture intrusion, and assess solar potential - all in one site visit. No charge, no commitment required before you see results.

02

Combined Permit Package Filing

One application covers roofing replacement and solar installation together. Los Angeles County coastal zone requirements get addressed upfront so the permit clears without revision requests slowing things down.

03

Roofing Replacement First

New roof goes on before any racking touches the deck. That sequence protects the manufacturer warranty and gives the solar system a clean, code-compliant surface rated for coastal exposure.

04

Solar Installation and Electrical

Racking mounts to the new roof, panels go up, and the electrical rough-in connects to your main panel. Everything stays on one crew's schedule with no handoff gaps between trades.

05

City Inspection and LADWP Activation

A single city inspection closes both permits. Then we file LADWP interconnection paperwork and walk you through net metering activation so billing adjusts before your next statement.

How it works

How Green Conception Runs a Pacific Palisades Solar and Roofing Project

Every project in 90272 starts with a free roof inspection and a site assessment for solar. We check the roof deck condition, note any coastal weathering, measure shading from the canyon topography, and pull your last 12 months of LADWP bills. From there we build one proposal covering both scopes. Once you approve the written quote - no deposit - we file the combined permit package with Los Angeles County. Coastal zone lots get flagged early so nothing surprises the inspector. Installation runs roofing first, then racking and panels, then electrical. City inspection closes both permits. LADWP interconnection follows and net metering activates. Most 90272 projects close in three to four weeks start to finish.

More from Green Conception

More Services for Pacific Palisades Homes

Tesla Ev Level 2 charger.jpg
Green-Conception_panel-replacement_section_roof-2.webp
pexels-hansmiddendorp-11784496.jpg

Roof Repair and Maintenance

Coastal homes in 90272 need annual checks - salt air works into flashing and ridge caps faster than inland. We handle targeted repairs, resealing, and preventive maintenance without requiring a full replacement if the deck is still solid.

Solar Panel Installation

A Level 2 charger becomes far more valuable paired with rooftop solar. We install residential solar built to work alongside your charger — so your vehicle runs on energy your home generates. We handle permitting, design, and installation for both systems together.

EV Charger Installation

Level 2 EV charger installation pairs naturally with a new solar system. We handle the panel capacity check, permit, and installation in one visit. Charging from your own solar production cuts your LADWP bill further and adds real daily value.

- Why us

Why 4S Ranch Homeowners Choose Green Conception

Licensed Contractors

Every Level 2 charger installation in 4S Ranch is completed by a licensed electrician. That matters for your safety, your permit, and your home-insurance policy.

Local Knowledge 

We pull all required permits for 4S Ranch and San Diego County on every single project. An unpermitted charger creates real problems at resale — ours will not.

Warranty

You get a written quote before work begins — charger, circuit, any panel work needed, and permits. No deposit required. What we quote is what you pay.

Manufacturer Warranty Included

Los Angeles County coastal zone permitting has layers most contractors skip. We know the checklist, we pull permits correctly the first time, and city inspections pass without re-inspection delays.

Free Inspection, No Deposit

You get a detailed written quote before any work starts. No deposit required to hold the project. Review it, compare it, ask questions - then decide. No pressure.

solar installer in a work.jpg

One Permit, One Crew, One Warranty for Coastal Homes

Pacific Palisades roofs and solar systems fail independently when separate contractors handle them. Green Conception builds the project as one scope from day one - same materials spec, same permit package, same warranty umbrella covering both trades without handoff risk.

Coastal Materials Spec First

Salt-air rated components get specified before pricing, not swapped in later.

Permit Package Built Together

Permit Package Built Together

Roof Deck Before Racking

New roofing always goes down before any solar racking touches the deck.

LADWP Interconnection Managed

LADWP Interconnection Managed

Single Warranty Document

One warranty covers both scopes - no gap for a leak to fall through.

"Pacific Palisades roofs get hit from every direction - marine layer in the morning, coastal wind all afternoon. If the roof isn't specced right before the panels go on, you're just sealing problems in. We don't let that happen."

— Nick K. · Founder

Green Conception Serving Pacific Palisades, 90272, Los Angeles County

Green Conception works regularly throughout Pacific Palisades, from the canyon-edge homes above Sunset Boulevard to the flat-street neighborhoods near the Village and the ridge lots overlooking the Pacific. 90272 homes range from mid-century ranch styles to newer construction, and each one gets a project scope built around its actual roof condition and LADWP usage - not a template. Licensed roofing contractor and solar installer, fully insured, pulling combined permits for every job.

— Common questions

Pacific Palisades Solar and Roofing Questions, Answered Straight

Does Pacific Palisades require Coastal Commission approval for solar?

Some 90272 lots near the bluff or in the Coastal Commission appeal zone do require additional review before permits clear. Most standard residential lots in Pacific Palisades don't trigger that review, but we check your parcel early in the process so nothing stalls the permit unexpectedly.

How long do Los Angeles County permits take in 90272?

Permits in Los Angeles County typically take 5-8 business days when the application is complete and correct on first submission. Coastal zone lots with incomplete documentation can run longer. Green Conception submits complete packages the first time, which keeps that timeline tight and predictable.

Can LADWP net metering work with a new solar install?

Yes - LADWP offers net metering for residential solar customers in Pacific Palisades. We size your system based on your actual LADWP consumption data, file the interconnection application, and confirm activation before closing the project. Your bill adjusts on the next statement cycle after approval.

What roofing materials hold up to salt air in 90272?

Architectural asphalt shingles with algae-resistant coating, Class 4 impact-rated products, and metal roofing all perform well in Pacific Palisades coastal conditions. We avoid standard three-tab shingles on coastal lots. Flashing and ridge cap materials get spec'd for salt exposure too, not just the field shingles.

Do you need to replace the roof before installing solar panels?

Not always, but if your roof has less than 10 years of life left, replacing it before solar installation is the right call. Pulling panels to re-roof later costs more than doing both now. We check the deck during the free inspection and give you a straight answer on remaining life.

Is a battery backup system worth adding in Pacific Palisades?

Pacific Palisades sits in a high-fire-risk zone where LADWP can cut power during red flag events. Battery storage keeps critical loads running during those shutoffs. Adding storage at the same time as solar reduces installation cost versus retrofitting later and qualifies for the federal tax credit in the same year.

How does one contractor covering both trades protect homeowners?

When separate contractors handle roofing and solar, warranty disputes happen at the seam between trades - each contractor argues the other caused the problem. One licensed roofing and solar contractor covers both scopes under one warranty. If a leak appears, there's no argument about who owns the fix.

What does a free roof inspection cover in Pacific Palisades?

The free inspection checks roof deck condition, flashing integrity, ridge and valley wear, underlayment exposure, and any signs of coastal moisture intrusion at penetrations. We also note shading angles for solar planning. You get a written summary of what we found and what, if anything, needs attention before panels go on.

Frequently asked questions

Verified · Real names · Real cities

What Pacific Palisades Homeowners Say About One Stop Solar and Roofing

Licensed California contractor · Fully insured · Real local crews · CSLB #964965
— Final step 

Free inspections this week.
Pick a slot — we'll take it from there.

Free site assessment · No deposit · CSLB #964965 · Experience you can rely on since 2014.

bottom of page